Project Name: Jiyuan Industry-City Integration Demonstration Zone Import-Export Processing and Trade Industrial Park — Zone A
Project Location: Jiyuan, Henan
Building Area: 48,564 m²
Building Function: Foxconn Production Workshop
Building Products: SS360 Roofing System + Rock-wool Sandwich Panel Wall System
This project is constructed on behalf of Foxconn. Founded in Taiwan in 1974, Foxconn now operates more than 40 campuses in mainland China and is the world's largest electronic technology manufacturing service provider. In 2022 it ranked No. 20 on the Fortune Global 500 list.
Aerial View
Ten years ago, Foxconn Technology established operations in Jiyuan and took only 179 days from groundbreaking to production. Ten years later, Foxconn Industrial Internet invested in this project—the 5G Terminal Precision Manufacturing Project, also known as the Jiyuan Industry-City Integration Demonstration Zone Import-Export Processing and Trade Industrial Park—which may once again redefine “Jiyuan Speed.”
ABC began main-plant structural installation on January 17, 2023, and completed topping-out by April 30 of the same year. In only 104 days, ABC achieved the equipment-entry conditions required by the project owner.
II. Individual Building Construction
This project is an integrated industrial campus combining high-end intelligent 5G mobile-phone manufacturing, AI manufacturing, and precision mold processing. ABC undertook steel-structure works for Buildings 2#, 4#, and 5#, totaling 48,564 square meters, with additional buildings starting progressively. Building 2# uses a portal-frame plus frame hybrid structure; Building 4# is a four-story steel-frame structure; Building 5# is a single-story steel-frame structure.
Building 2#
Because Building 2# has large bay spacing, conventional construction methods would increase secondary-structure deflection. ABC adopted targeted measures to ensure engineering quality.
Building 2# Facade
While ensuring structural strength and implementing the clean design intent of Building 2#, ABC used a rock-wool sandwich-panel system on the facade, complemented by refined ribbon windows so that construction details correspond with the overall architectural style of the campus.
Building 4#
The curved structure at the corner of Building 4# requires extremely precise fabrication and installation—small deviations could lead to major errors. Through close coordination among ABC's technical team, in-house production system, and on-site team, the challenge was completed quickly, efficiently, and successfully.
III. ABC Quality & ABC Speed
ABC Engineering Details
ABC has an experienced professional team that can respond rapidly while maintaining delivery efficiency. During foundation construction for Building 2#, the preceding process had already completed rebar tying, making safe placement of subsequent steel-structure embeds difficult to guarantee. Based on actual site conditions and after remeasurement and verification, ABC engineering and technical personnel coordinated design adjustments to anchor bolts and column base plates while ensuring structural safety, linked with the manufacturing center, accelerated processing, and raced against time to protect the schedule.
Envelope Solution Rendering
After seeing ABC's control of schedule and quality, the owner decided in April to continue entrusting ABC with envelope works for Buildings 4# and 5#.