# # CN # # # # Contact Us
News “Steel Wings” of SF MRO Hangar at Ezhou Huahu Airport

“Steel Wings” of SF MRO Hangar at Ezhou Huahu Airport

Publication Date:2026-05-27

At Hubei Ezhou Huahu International Airport, Asia’s first and the world’s fourth dedicated cargo hub, the SF MRO maintenance hangar has welcomed its first overseas aircraft for maintenance. This massive aviation maintenance facility can accommodate two wide-body aircraft plus one narrow-body aircraft for maintenance simultaneously.


1.png

2.png

Photo source: Changjiang Cloud News


As a long-span steel structure building, the roof enclosure system of the MRO maintenance hangar faces mechanical and climatic challenges vastly different from those of conventional steel buildings. Its requirements for wind uplift resistance, waterproofing, fire protection and other performance indicators exceed those of ordinary industrial buildings.


3.jpg


With over 30 years of in-depth experience in the steel structure industry, ABC has obtained a full set of stringent certifications for its metal roof and enclosure systems, including AISC, FM, CE, UL and CIBD. We are honored to participate in the enclosure construction of the SF MRO maintenance hangar, elevating the strategic partnership between SF and ABC to a new level.


4.jpg


I. Core Infrastructure of the Aviation Support System


Stepping into the SF MRO maintenance hangar, visitors are immediately struck by its monumental scale: the main hall features spans of 137m + 88m, with a maximum roof elevation of 35.4m.


5.png

Such a large-span column-free structure ensures unobstructed aircraft towing, parking and maintenance operations, while imposing higher performance requirements on the hangar’s enclosure system. ABC adopted the SS360 roof system combined with sandwich panel system for this project.


The SS360 roof system delivers outstanding waterproof performance and is FM-certified with superior wind uplift resistance, keeping the hangar robust and secure even under extreme weather conditions. During the wind uplift test in the later phase of the project, our enclosure system fully met the design specifications.


II. Robust Steel Enclosure with Both Strength and Refined Details


Faced with complex joints from the space truss structure, ABC’s technical team optimized the connection solutions of the enclosure system one by one to guarantee precision and reliability for every panel and every seam.


7.jpg


During the installation of wall sandwich panels, the front facade structure around the hangar doors was highly complex and demanded extremely high construction accuracy. Rising to the challenge, ABC’s team repeatedly calibrated and adjusted wall purlins, allocated additional manpower and construction equipment, and held constant consultations with on-site contractors and the general contractor. The full wall sandwich panel installation was completed within a tight schedule.


Standing tall today, this MRO maintenance hangar serves as SF Airlines’ core maintenance and support base in Central China. From logistics warehouses to cutting-edge aviation maintenance projects, from fundamental manufacturing to authoritative certifications, ABC keeps fulfilling its promise of Professional, Reliable and Efficient with solid, down-to-earth progress.


# # Previous # Wind Resistance at Its Best | Facing Typhoon Bavi, ABC’s Dual-Certified Roofing Systems Reinforce Safety Barriers Next: 32nd Anniversary · A Steel-Structure Chapter | ABC Premium Project Review — Issue 1 # #