News ABC Classic Project | Unilever Wall's Taicang Lighthouse Factory

ABC Classic Project | Unilever Wall's Taicang Lighthouse Factory

Publication Date:2022-06-29

Image


Project Name: Unilever Wall's Taicang Ice Cream Relocation Project

Building Area: Approximately 32,000 m²

Building Products: SS360 Standing-seam Roofing / Flexible Roofing System; Wall Sandwich Panels / Vertically Installed MRP Wall System

Project Certifications: FM Certification, LEED Gold


Wall's is a well-known British ice cream brand headquartered in the United Kingdom with operations around the world and is part of Unilever. In China, its ice cream is marketed under the Wall's brand, and Unilever is one of the world's largest ice cream producers.


As the world's first Lighthouse Factory in the ice cream industry, Unilever Wall's Taicang factory uses technology to empower ice cream production and innovation. It features AI models, consumer-oriented digital innovation tools, flexible production lines, lights-out automated operation, and an end-to-end connected value chain. Carbon emissions have been reduced by 83%, while energy and water consumption have been reduced by 14%, and the factory is expected to achieve carbon neutrality within the next two years.


ImageImage


An ideal industrial building should combine an attractive appearance and refined details with practicality and durability. The Taicang Wall's project continues the architectural style of Unilever's previous factories.



Production Workshops 1 and 2 use reinforced-concrete frame structures. The walls adopt a horizontally installed purlin-free system, with individual panels up to 12 meters long, creating significant installation and construction challenges. The roof combines the SS360 standing-seam system and flexible roofing system while meeting both FM and LEED Gold requirements.


Image


Raw-material warehouse and cold storage use all-steel structures. The standing-seam roofing system meets FM certification requirements, while the walls use vertically installed MRP large-corrugation panels for a more attractive and impressive appearance that meets both architect and owner expectations. The project combines standing-seam and flexible roofing systems, single-skin color-coated steel and sandwich-panel wall systems, and complex junctions between horizontal and vertical panel arrangements. The owner also had demanding requirements for facade details, including highly complex decorative color bands.


Image


Image


The project contains numerous indoor and outdoor pipe corridors and suspended platforms, many individual buildings, diverse structural systems, and extensive cross-disciplinary coordination. Despite the high construction difficulty, ABC overcame the challenges, completed the project on schedule and to the required quality, and met customer requirements and expectations.


Image


ABC is committed to creating sustainable, green, low-carbon buildings for customers and contributing to the early achievement of carbon neutrality.