Project Name: Tianshan Nongfu Annual 40,000-ton Nut Production, Cold-chain Warehousing and Trade Settlement Project - Phase I
Building Area: 29,661 m²
Location: Xiaogan, Hubei Province
Function: Warehousing and Logistics
Building Products: SS360 Roofing System, AC780 Wall System, Sandwich Panel System
On the fertile land of Xiaogan, Tianshan Nongfu shines in the nut industry with its distinctive strengths. It is not only a reprocessing center for imported nuts, but also a guardian and steward of nut quality.
I. Benchmark Strength Wins Customer Trust
After ABC successfully delivered the Xiaogan Meiyijia project in 2021, its excellent quality quickly made the project a local showcase and benchmark for investment promotion and planning.
Building on this high-quality project, ABC connected with the owner of the Tianshan Nongfu project, located about a 30-minute drive away. After detailed inspections and visits, ABC assisted the customer in changing the original civil-construction scheme to a steel-structure solution.
ABC's professional steel-structure solution team tailored the park plan for the owner, completing circulation, logistics, facade planning, and architectural design, and successfully secured the steel-structure construction contract.
A Reputation-Building Project Under Construction
II. Color and Craftsmanship, Refined in Every Detail
The project facade combines rock-wool sandwich panels with AC780 panels to achieve a diverse blend of aesthetics and individuality. Horizontally installed AC780 panels emphasize the broad horizontal scale of industrial architecture.
Combination of Multiple Panel Types
Gray is used as the main color, giving the building a calm and understated character. Orange-red accents brighten the facade, highlight the office area, and make the entire building feel more vivid and energetic.
Canopies, windows, trims, and wall-panel combinations are modeled in TEKLA and installed in a standardized manner to ensure flat facades and straight, symmetrical lines, creating an orderly and harmonious industrial building. Undeterred by extreme heat or bitter cold, ABC overcame many difficulties, completing delivery of two core buildings in the year the contract was signed and completing the overall park in the following year.