In 2024, the global automotive market experienced wave after wave of new-energy growth, with new-energy vehicles becoming a new engine of industry development. The Cubison Tire project shines brightly amid this booming market.


ABC undertook construction of all 17 buildings in the Cubison Tire project. Driven by strong market demand, the project placed exceptional emphasis on construction speed.


Divider.png


Project Card


1.jpg

Project Name: Cubison Annual 15 Million High-end Semi-steel Radial Tire Project

Building Area: 160,000 m²

Location: Huai'an, Jiangsu Province

Function: Tire Production Lines and Supporting Facilities

Building Products: SS360 Roofing System, MRP Wall System, SSP Interior Wall Panel System


I. Tight Schedule: Accelerating Without Compromising Quality


To respond to market demand, the customer requested that the planned completion date be brought forward by two full months and that some workshops begin production early, creating a significant challenge for ABC's schedule management.


2.jpg


ABC has never avoided difficult tasks. It planned material arrivals in advance, added management personnel and labor resources, and developed detailed construction schedules, accelerating progress without compromising quality so the owner's production could begin as early as possible.


II. Technical Challenges: Bold Ideas and Decisive Action


The Cubison project features very large individual buildings, nearly 700 meters long and 160 meters wide, and large column grids of 18 m × 24 m, with some column spacing reaching 20 meters. Even amid fast-paced construction, there were many memorable challenges↓↓↓


1. Rainy and Muddy Conditions

Construction took place during the rainy season, when muddy roads greatly increased difficulty. ABC added equipment, adjusted work sequences, and monitored weather conditions to minimize climate impacts.


3.jpg


2. Difficult Lifting Around Deep Foundation Pits

Deep foundation pits disrupted continuous lifting operations. ABC carefully calibrated components, inspected potential safety hazards, and actively addressed lifting challenges to ensure construction quality.


4.jpg


3. High-altitude Work

Lattice purlins have complex configurations and many members, requiring long-span installation at height. ABC adopted strict safety measures and placed special emphasis on installation accuracy.


5..jpg


III. Far-reaching Significance, Supporting Development


With the joint efforts of the government, customer, and ABC, trial production began in December 2024 and formal operations started in January 2025. Overall project construction progress was at least two months ahead of schedule.


6.jpg


The Cubison Tire project not only aligns with national support for the new-energy industry but also promotes related industrial development and further strengthens the position of China's tire industry in the global market.


ABC will continue to uphold the spirit of craftsmanship, pursue excellence, and create greater value for customers.